Follow us :

How long do I have to leave the heating system, after screeding, before I can switch on?

It is recommended that any screed be allowed to cure naturally, and this would also depend upon its thickness. Generally, the length of time from the screed being laid and the system being ready to switch on is sufficient for it to dry out.